A structured runbook template for a single application’s migration cutover, covering pre-cutover checks, the cutover sequence itself, validation steps, and a documented rollback trigger and procedure.
Why a rollback section is mandatory
Every runbook built from this template requires an explicit rollback trigger condition and procedure filled in before a cutover window is scheduled — “we’ll figure out rollback if we need it” is the most common cause of extended outages during a botched cutover.
Leave a Reply